Pre-demolition Survey for Ferrybridge Power Station Decommission 

Share

As the UK continues its transition away from coal-fired power generation, our specialist team at Lucion Services was engaged by SSE Generation Limited to conduct comprehensive pre-demolition surveys at Ferrybridge Power Station, a significant 1950s industrial facility which ceased operations in 2016.

The Challenge

Ferrybridge Power Station presented one of the UK power sector’s most complex survey projects. The vast industrial site featured over 100 structures, including a 200-metre-long boiler house standing 60 metres high, turbine halls, flue-gas desulphurisation plant, eight cooling towers, three chimneys, and extensive coal handling infrastructure including stock yard buildings, conveyors and transfer houses.

This unique environment demanded exceptional coordination across multiple technical disciplines while maintaining rigorous safety standards throughout operational areas. 

Our asbestos services delivered on this project included: 

£450k Contract Value

13k Asbestos Samples Taken

150+ Structures & Buildings Surveyed

Technical Solution

Through strategic collaboration with SSE Generation Limited, a comprehensive surveying programme was developed. A specialist team of 15 surveyors, supported by dedicated project and account managers, implemented a zone-based methodology ensuring thorough assessment while maintaining strict operational safety protocols. The programme integrated multiple access strategies, combining rope access technicians, MEWPs, and specialist civils teams for concrete investigation works.

Ready to discuss your project?

Our expert consultants are on hand to discuss your needs. Arrange a call today.

Get in touch direct:

+44(0)345 5040 303

[email protected]

Collapsible Contact Us
Full name

Register for IMPACT Bulletin

Lucion Impact Bulletin

Verified. Accredited. Certified. Trusted.