The Institution of Lighting Professionals (ILP) have produced a guidance note (GN01) originally published in 2001 and regularly updated. This document is a key reference document for planning applications in the UK and is generally used as the basis for assessment for lighting impacts.

This note was updated recently at the end of July 2026. One significant change is the title of the document now being ‘The Avoidance of Obtrusive Light’ rather than ‘The Reduction of Obtrusive Light’. The latest version of the guidance note is GN01/26 which supersedes GN01/21. 

What Does the Guidance GN01/2026 Say?

The updated ILP guidance note: 

  • Provides the basis for determining an appropriate baseline for lighting through definitions for Environmental Zones 
  • Gives limits to how much light should be entering windows from new development 
  • Gives limits as to how bright new lights should be in relation to surrounding receptors 
  • Gives limits for upward light radiation to manage impact on the night sky  
  • Gives good practice design measures and mitigation options for when lighting can be a challenge. 

All of the above are used by lighting practitioners to determine whether a development’s lighting will result in a significant impact and may form a significant planning constraint. There is a general principle used throughout the lighting industry that “Good lighting practice is the provision of the right light, at the right time, in the right place, controlled by the right system.” 

Generally, there will always be a solution to lighting issues but this will require positive engagement with lighting designers/suppliers and environmental professionals. 

What’s Changed?

The new version of the guidance retains the same general lighting principles as the previous version and the limits specified for lighting have generally not changed. As such, don’t expect that there will be a more onerous requirement for mitigating light spill from your development or that there will now be a requirement to make things even brighter.  

However, there are some key differences that are worth being aware of for anyone looking at lighting assessments for planning.  

Planning Requirements Checklist

There is a new example checklist which gives details on the recommended core information that Planners should request when considering any application where external lighting is being proposed. 

These requirements are very specific for example including lux contours down to 0.5 lux. There is also greater emphasis on providing information as to how a lighting scheme will avoid / mitigate any potential biodiversity impacts arising from the installation or operation of the proposed lighting as well as evidence of compliance with this guidance note. 

This checklist is likely to be picked up by Local Authorities when making decisions and will require a greater weight of evidence to be submitted as part of planning applications in a specific format.  

What’s the Plan(ning Policy)?

While not a direct reference document for planning policy, the guidance does provide useful context for how the National Planning Policy Framework (NPPF) and Planning Practice Guidance (PPG) should be applied within a lighting context.  

Of particular note is guidance’s emphasis on the “agent of change” principle. This will put greater emphasis on new developments which are going next to existing light sources to seek to mitigate the effects of light on future occupiers so they do not ‘come to a nuisance’. 

Halt! Who Goes There?

One difference is that the term ‘light trespass’ is no longer used by the ILP. The phrasing around light as an environmental issue should generally be “nuisance” or “light spill”. This is because ‘trespass’ is a term used to physically encroach on land, which light cannot do. 

Sky Quality Measurements are out

The previous version of the guidance suggested a typical Sky Quality Measurement (SQM) level to help inform which Environmental Zone a study site would fall into. The update acknowledges that undertaking these measurements could prove overly onerous and it is no longer recommended to use SQMs to assist in determining an Environmental Zone.  

This should make the assessment of baseline easier for practitioners. 

How can Lucion help?

Our in house technical team has over 15 years of experience completing detailed lighting assessments for a range of planning applications from residential and industrial developments to sports pitches.  

We have a range of experience dealing with different lighting issues including: 

  • Lighting within protected Dark Sky landscapes 
  • Impact of lighting on sensitive nocturnal species (bats, badgers, etc) 
  • Impact of lighting from new development on surrounding sensitive receptors. 

Please get in touch with [email protected] for more information. 

Get Approval For Your Planning Application

Light Impact Assessemtns

When planning a new development, understanding and managing lighting impacts is essential for regulatory compliance and environmental responsibility. Our lighting consultants evaluate the effects of artificial lighting on people and wildlife to support compliant, low-impact design.

Biodiversity Net Gain

Biodiversity Net Gain (BNG) is a mandatory requirement for most new developments in England, aiming to leave the natural environment in a measurably better state than before. Lucion’s team of experienced ecologists are here to guide you through the BNG process, from conducting comprehensive biodiversity impact assessments to developing tailored mitigation strategies that unlock opportunities for habitat enhancement and creation.

Flood Risk Assessments for Planning Applications

Planning applications on sites within or near flood zones face significant scrutiny from the Environment Agency and Local Planning Authorities. A professional Flood Risk Assessment (FRA) is essential to demonstrate your development is safe from flooding and won’t increase risk elsewhere. Our Water Services Consultants identify site-specific flood risks from all sources.

Complete Drainage Solutions

From soakaway testing to assess ground conditions, to full drainage design incorporating attenuation calculations, we deliver cost-effective solutions that safeguard your development against surface water flooding. Engaging with us early helps avoid planning objections, prevents costly redesigns, and ensures your project stays on track.

Trusted, Accredited Services

Constructionline Gold

Constructionline Gold includes Acclaim’s SSIP accreditation, streamlining compliance and health and safety information.

Lucion Services Ltd – View our certificate

Lucion Surveys Ltd – View Our Certificate

Lucion Delta-Simons Ltd – View Our Certificate

Lucion Ground Engineering Ltd – View Our Certificate

Chartered Institute of Ecology and Environmental Management

Lucion’s team of Ecologists undergo specialist training and maintain active membership with the Chartered Institute of Ecology and Environmental Management.

CHAS Elite Certification

Lucion Surveys Ltd is CHAS Elite Accredited

View our Certificat CHAS-0001023

One Team For Your Planning Application

Ecology & BNG Surveys

Ensure your application is complaint with Preliminary Ecological Appraisal and Biodiversity Net Gain Calculations from Lucion.

Soakaway Testing

As part of the wider Lucion group, we can conduct BRE 365-compliant soakaway testing to confirm infiltration viability early in the planning process, informing the most cost-effective drainage solution for your site.

Site Identification

Our housebuilders GIS site identification tool helps you identify viable sites at speed.

Register for IMPACT Bulletin

Lucion Impact Bulletin

Verified. Accredited. Certified. Trusted.